Project Timeline For Graphic Design Proposal Ppt PowerPoint Presentation Layouts Master Slide
- Google Slides is a new FREE Presentation software from Google.
- All our content is 100% compatible with Google Slides.
- Just download our designs, and upload them to Google Slides and they will work automatically.
- Amaze your audience with SlideGeeks and Google Slides.
-
Want Changes to This PPT Slide? Check out our Presentation Design Services
- WideScreen Aspect ratio is becoming a very popular format. When you download this product, the downloaded ZIP will contain this product in both standard and widescreen format.
-
- Some older products that we have may only be in standard format, but they can easily be converted to widescreen.
- To do this, please open the SlideGeeks product in Powerpoint, and go to
- Design ( On the top bar) -> Page Setup -> and select "On-screen Show (16:9)” in the drop down for "Slides Sized for".
- The slide or theme will change to widescreen, and all graphics will adjust automatically. You can similarly convert our content to any other desired screen aspect ratio.
Compatible With Google Slides
Get This In WideScreen
You must be logged in to download this presentation.
Audience

Editable

Google Slides
Features of these PowerPoint presentation slides:
Presenting this set of slides with name project timeline for graphic design proposal ppt powerpoint presentation layouts master slide. The topics discussed in this slide is project timeline for graphic design. This is a completely editable PowerPoint presentation and is available for immediate download. Download now and impress your audience.
People who downloaded this PowerPoint presentation also viewed the following :
Project Timeline For Graphic Design Proposal Ppt PowerPoint Presentation Layouts Master Slide with all 2 slides:
Most Relevant Reviews
No Reviews