Project Administration Bundle Project Status Report With Key Issues Summary PDF
- Google Slides is a new FREE Presentation software from Google.
- All our content is 100% compatible with Google Slides.
- Just download our designs, and upload them to Google Slides and they will work automatically.
- Amaze your audience with SlideGeeks and Google Slides.
-
Want Changes to This PPT Slide? Check out our Presentation Design Services
- WideScreen Aspect ratio is becoming a very popular format. When you download this product, the downloaded ZIP will contain this product in both standard and widescreen format.
-
- Some older products that we have may only be in standard format, but they can easily be converted to widescreen.
- To do this, please open the SlideGeeks product in Powerpoint, and go to
- Design ( On the top bar) -> Page Setup -> and select "On-screen Show (16:9)” in the drop down for "Slides Sized for".
- The slide or theme will change to widescreen, and all graphics will adjust automatically. You can similarly convert our content to any other desired screen aspect ratio.
Compatible With Google Slides
Get This In WideScreen
You must be logged in to download this presentation.
Audience

Editable

Google Slides
Features of these PowerPoint presentation slides:
The following slide provides the sprint project tracker as it displays the details of various sprints, the number of tasks completed and the average of all sprints. This is a Project Administration Bundle Project Status Report With Key Issues Summary PDF template with various stages. Focus and dispense information on six stages using this creative set, that comes with editable features. It contains large content boxes to add your information on topics like Project Manager, PrProject Manager, Project Sponsor, Key Risks. You can also showcase facts, figures, and other relevant content using this PPT layout. Grab it now.
People who downloaded this PowerPoint presentation also viewed the following :
Most Relevant Reviews
-
Great quality product.
-
Great quality slides in rapid time.