Six Stages Project Status Report Ppt Infographic Template

Rating:
90%

You must be logged in to download this presentation.

Favourites
Loading...
Impress Your
Audience
100%
Editable
Compatible with
Google Slides

Features of these PowerPoint presentation slides:

This is a six stages project status report ppt infographic template. This is a six stage process. The stages in this process are overall project status is green, schedule, resourcing, budget, risks, issues, benefits, the project schedule is on track, resourcing is adequate, project is within control, all project risks are in control, project issues need attention, project benefits are off track and need to be fixed.

People who downloaded this PowerPoint presentation also viewed the following :

Ratings and Reviews

90% of 100
Write a review

Most Relevant Reviews

  1. 100%

    by Romika

    Topic best represented with attractive design.
  2. 80%

    by may

    Design layout is very impressive.
per page: