Product Development Resource Planning Ppt PowerPoint Presentation Show Portrait Cpb
- Google Slides is a new FREE Presentation software from Google.
- All our content is 100% compatible with Google Slides.
- Just download our designs, and upload them to Google Slides and they will work automatically.
- Amaze your audience with SlideGeeks and Google Slides.
-
Want Changes to This PPT Slide? Check out our Presentation Design Services
- WideScreen Aspect ratio is becoming a very popular format. When you download this product, the downloaded ZIP will contain this product in both standard and widescreen format.
-
- Some older products that we have may only be in standard format, but they can easily be converted to widescreen.
- To do this, please open the SlideGeeks product in Powerpoint, and go to
- Design ( On the top bar) -> Page Setup -> and select "On-screen Show (16:9)” in the drop down for "Slides Sized for".
- The slide or theme will change to widescreen, and all graphics will adjust automatically. You can similarly convert our content to any other desired screen aspect ratio.
Compatible With Google Slides
Get This In WideScreen
You must be logged in to download this presentation.
Audience

Editable

Google Slides
Features of these PowerPoint presentation slides:
Presenting this set of slides with name product development resource planning ppt powerpoint presentation show portrait cpb. This is an editable Powerpoint four stages graphic that deals with topics like product development resource planning to help convey your message better graphically. This product is a premium product available for immediate download and is 100 percent editable in Powerpoint. Download this now and use it in your presentations to impress your audience.
People who downloaded this PowerPoint presentation also viewed the following :
Product Development Resource Planning Ppt PowerPoint Presentation Show Portrait Cpb with all 6 slides:
Most Relevant Reviews
No Reviews