Corporate Resource Planning Finance And Accounting ERP Module Slides PDF
- Google Slides is a new FREE Presentation software from Google.
- All our content is 100% compatible with Google Slides.
- Just download our designs, and upload them to Google Slides and they will work automatically.
- Amaze your audience with SlideGeeks and Google Slides.
-
Want Changes to This PPT Slide? Check out our Presentation Design Services
- WideScreen Aspect ratio is becoming a very popular format. When you download this product, the downloaded ZIP will contain this product in both standard and widescreen format.
-
- Some older products that we have may only be in standard format, but they can easily be converted to widescreen.
- To do this, please open the SlideGeeks product in Powerpoint, and go to
- Design ( On the top bar) -> Page Setup -> and select "On-screen Show (16:9)” in the drop down for "Slides Sized for".
- The slide or theme will change to widescreen, and all graphics will adjust automatically. You can similarly convert our content to any other desired screen aspect ratio.
Compatible With Google Slides
Get This In WideScreen
You must be logged in to download this presentation.
Audience

Editable

Google Slides
Features of these PowerPoint presentation slides:
slide represents the finance and accounting ERP module, and it helps automate all the tasks that the organization performed manually at present.Presenting Corporate Resource Planning Finance And Accounting ERP Module Slides PDF to provide visual cues and insights. Share and navigate important information on eight stages that need your due attention. This template can be used to pitch topics like Source Document, Multi Label Accounting, Closing Accounts And Stock Validation In addtion, this PPT design contains high resolution images, graphics, etc, that are easily editable and available for immediate download.
People who downloaded this PowerPoint presentation also viewed the following :
Most Relevant Reviews
-
Best way of representation of the topic.
-
Awesome use of colors and designs in product templates.